Menu
Your Cart

Wood Boiler for Central Heating BURNiT NWB MAX 55, 55kW

Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Last item in stock FREE DELIVERY
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood burning boiler BURNiT NWB MAX 55, 55kW | Wood Burning Boilers |  |
Wood Boiler for Central Heating BURNiT NWB MAX 55, 55kW

Solid fuel boiler Burnit NWB MAX 55 for central heating of premises up to 340m². Constructed for solid fuel burning - wood, wood briquettes class B and coal.

In stock 1 pcs.
  • Stock: In Stock
  • Brand: BURNiT
  • SKU: 08.438.010
£1,962.59
Excl. VAT

You may also need:

£45.54
Total: £45.54
£323.23
Total: £323.23
£668.03
Total: £668.03
£80.08
Total: £80.08
£13.35
Total: £13.35

*Products are shipped from Europe. The customer must pay any applicable VAT and customs duties.

Estimated delivery
23.Nov.2026
DHL Schenker Dachser
See Shipping Policy

365 DAY RETURN
​365 daysSee details

SECURE PAYMENTS
    See details

Steel boiler with natural air feed, controlled by a thermostatic draught regulator. Solid fuel boilers NWB MAX range in nominal output from 20 to 110 kW to satisfy the heating demands of medium to large sized spaces. They are engineered for burning solid fuel - wood, wood briquettes class B and coal, and provide the option for fitting pellet, oil or gas-fired burners. 

 

Manufacture

The boiler body is manufactured from high quality steel with 5mm thickness for the combustion chamber and 3mm thickness for the water mantle. The combustion chamber has a large heat exchanging surface and low chamber impedance. Large firebox door ensures easy loading even of large chunks of wood.

 

Effectiveness

To increase the heat exchange, the combustion chamber's surface is ribbed and designed for a three-pass flue gas flow. The mantle completely envelops the firebox for maximized usage of the heat. The boiler's body is insulated from the external conditions by 50mm thick high temperature resisting wool. This series uses a thermostatic draught regulator that opens or closes a flap on the lower door, depending on the amount of air needed for the burning process.

 

Safety devices

For a safe and reliable operation of the boiler, a number of safety devices are installed

- Thermostatic draught regulator;

- Removable metallic ash grate protects the heat exchanging pipes and the chamber base from the flame;

- Pressure relief valve 3 bar incl.in the delivery set;

- Safety heat evacuator: a tap-water filled line passes through the uppermost part of the boiler body. In case of overheating it is triggered open by a thermostatic valve (not included) to evacuate the heat off the boiler.

 

Fuel

The central heating boiler can operate with natural untreated wood, but also with coal and compressed solid fuels such as briquettes. Maximum length of the wood logs is between 330mm and 500mm depending on the model. Fuel moisture should be 20% or lower.

In order to use the maximum caloricity of the fuel, the wood logs should be dried for a prolonged period of time. High moisture levels reduces caloricity and the output power of the boiler.

 

Versatility

This series of boilers is manufactured for burning solid fuel, with the option of adaptation to a different kind of fuel. This is possible by mounting a pellet, gas or an oil burner on the lower door opening. A flange is also needed to mount the burner (optional).

 

Schematic of the main features of a NWB MAX wood boiler



 

Legend:

1. Temperature indicator
2. Housing
3. High efficiency thermal insulation
4. Safety heat evacuator
5. Three-pass flue gas flow
6. Mantle
7. Combustion chamber
8. Metal grate
9. Ash-and-soot container
10. Burner flange
11. Flue
12. Hot water outlet
13. Thermostatic regulator
14. Air intake flap

This appliance complies with EN 303-5.

Characteristics
Characteristics can fit pellet burner
Nominal heat output (kW) 55
Weight (kg) 330.0000
Country of Manufacture Bulgaria
Dimension Depth (mm) 990
Dimension Width (mm) 624
Dimension Height (mm) 1115
Warranty 2 Years
Operating pressure (bar) 3
Certification CE
Approximate heating surface (m²) 340
Energy efficiency class A
Mantle volume (L) 106
Insulation boiler High efficiency thermal wool
Combustion chamber volume (L) 103
Flue (mm) 180
Exhaust Location Back side
Control panel No
Control of central heating pump No
Combustion forced ventilation No
Recommended fuel coal
Automatic cleaning system No
Approximate heating capacity (m³) 918
Construction material Steel
Expansion vessel included No
Temperature indicator Yes
Cold water inlet 1 1/4"
Hot water outlet 1 1/4"
Circulation pump included No
Insulation doors high efficiency thermal wool
Heating type Hydro - Radiator
Lining No
Drain 1/2"
Placement Center
Loading door size (Height, Width), mm 310/ 490
Maximum length of the firewood logs (mm) 300-500
Thermostatic draught regulator Yes
Chimney draught flap Yes
Flue damper Yes
Type File Information
Manual_BURNiT_NWB_MAX.pdf 7.96MB