Menu
Your Cart

Pellet Boilers

Pellet Boiler Velmora Fire ECO EKP 20, 20kW - Pellet Boilers Pellet Boiler Velmora Fire ECO EKP 20, 20kW - Pellet Boilers
FREE DELIVERY
Brand: Velmora Fire Model: ECO EKP 20
Powerful and economical heating for large homes The Velmora Fire ECO EKP 20 pellet boiler is a reliable central heating solution for houses and buildings with a heated volume of up to 400 m³. With a nominal heat output of 20 kW and a high efficiency of 92%, the boiler turns as much of the energy ..
£1,807.85
Pellet Boiler Velmora Fire ECO EKP 25, 26kW - Pellet Boilers Pellet Boiler Velmora Fire ECO EKP 25, 26kW - Pellet Boilers
FREE DELIVERY
Brand: Velmora Fire Model: ECO EKP 25
Powerful and economical heating for large homes The Velmora Fire ECO EKP 25 pellet boiler is a reliable central heating solution for houses and buildings with a heated volume of up to 520 m³. With a nominal heat output of 26 kW and a high efficiency of 92%, the boiler turns as much of the energy ..
£1,892.01
Pellet Boiler Velmora Fire ECO EKP 30, 30kW - Pellet Boilers Pellet Boiler Velmora Fire ECO EKP 30, 30kW - Pellet Boilers
FREE DELIVERY
Brand: Velmora Fire Model: ECO EKP 30
Powerful and economical heating for large homes The Velmora Fire ECO EKP 30 pellet boiler is a reliable central heating solution for houses and buildings with a heated volume of up to 600 m³. With a nominal heat output of 30 kW and a high efficiency of 90%, the boiler turns as much of the energy ..
£1,981.03
Pellet Boiler Velmora Fire ECO EKP 36, 36kW - Pellet Boilers Pellet Boiler Velmora Fire ECO EKP 36, 36kW - Pellet Boilers
FREE DELIVERY
Brand: Velmora Fire Model: ECO EKP 36
Powerful and economical heating for large homes The Velmora Fire ECO EKP 36 pellet boiler is a reliable central heating solution for houses and buildings with a heated volume of up to 720 m³. With a nominal heat output of 36 kW and a high efficiency of 91%, the boiler turns as much of the energy ..
£2,110.52
Pellet Stove Velmora Fire ES 24, 23.46kW - Pellet Boilers Pellet Stove Velmora Fire ES 24, 23.46kW - Pellet Boilers
FREE DELIVERY
Brand: Velmora Fire Model: ES 24
Efficient heat for spacious homes If you are looking for a reliable central heating system for a house or other building with a heated volume of up to 480 m³, the Velmora Fire ES 24 pellet stove with back boiler is an excellent choice. Its nominal heat output is 23.46 kW and its efficiency reache..
£1,895.25
Pellet Stove Velmora Fire ES 34, 34.8kW - Pellet Boilers Pellet Stove Velmora Fire ES 34, 34.8kW - Pellet Boilers
FREE DELIVERY
Brand: Velmora Fire Model: ES 34
Efficient heat for spacious homes If you are looking for a reliable central heating system for a house or other building with a heated volume of up to 680 m³, the Velmora Fire ES 34 pellet stove with back boiler is an excellent choice. Its nominal heat output is 34 kW and its efficiency reaches 9..
£2,252.95
Pellet boiler Mavil Primus 25, 29kW - Pellet Boilers Pellet boiler Mavil Primus 25, 29kW - Pellet Boilers
FREE DELIVERY
Brand: MAVIL Model: PRIMUS 25
Modern, economical and easy heating for every homeThe Mavil Primus pellet boiler is a high-quality steel boiler designed specifically for burning biomass - such as pellets, wood, nuts, corn kernels, etc.It is a popular choice for both private homes and larger heating systems, thanks to its high..
£2,731.78
Pellet boiler Mavil Primus 34, 40kW - Pellet Boilers Pellet boiler Mavil Primus 34, 40kW - Pellet Boilers
FREE DELIVERY
Brand: MAVIL Model: PRIMUS 34
Modern, economical and easy heating for every homeThe Mavil Primus pellet boiler is a high-quality steel boiler designed specifically for burning biomass - such as pellets, wood, nuts, corn kernels, etc.It is a popular choice for both private homes and larger heating systems, thanks to its high..
£3,003.38
Pellet boiler Mavil Primus 45, 52kW - Pellet Boilers Pellet boiler Mavil Primus 45, 52kW - Pellet Boilers
FREE DELIVERY
Brand: MAVIL Model: PRIMUS 45
Modern, economical and easy heating for every homeThe Mavil Primus pellet boiler is a high-quality steel boiler designed specifically for burning biomass - such as pellets, wood, nuts, corn kernels, etc.It is a popular choice for both private homes and larger heating systems, thanks to its high..
£3,208.31
Pellet boiler Mavil Primus 60, 70kW - Pellet Boilers Pellet boiler Mavil Primus 60, 70kW - Pellet Boilers
FREE DELIVERY
Brand: MAVIL Model: PRIMUS 60
Modern, economical and easy heating for every homeThe Mavil Primus pellet boiler is a high-quality steel boiler designed specifically for burning biomass - such as pellets, wood, nuts, corn kernels, etc.It is a popular choice for both private homes and larger heating systems, thanks to its high..
£3,320.08
Pellet boiler Mytherm Thalia Plus 18 orange, 18kW - Pellet Boilers Pellet boiler Mytherm Thalia Plus 18 orange, 18kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: THALIA PLUS 18 Black
Pellet boiler Mytherm Thalia Plus 18 orange, 18kW
Pellet boiler Mytherm Thalia Plus 20 orange, 20kW
Pellet boiler Mytherm Thalia Plus 25 orange, 25kW
Pellet boiler Mytherm Thalia Plus 35 orange, 35kW
Pellet boiler Mytherm Thalia Plus 45 orange, 45kW
 Save 20% on your fuel costs  and ensure comfortable heat in every corner of your home. With this highly efficient water-jacketed pellet boiler you will feel the real difference in the first month !  With THALIA plus – COMPACT, energy saving becomes not just a goal, but a result...
£2,262.11
Pellet stove with back boiler Mytherm IOLI TS 18 grey, 18kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TS 18 grey, 18kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TS 18 Grey
Pellet stove with back boiler Mytherm IOLI TS 18 red, 18kW
Pellet stove with back boiler Mytherm IOLI TS 18 beige, 18kW
Pellet stove with back boiler Mytherm IOLI TS 18 grey, 18kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£1,988.04
Pellet stove with back boiler Mytherm IOLI TS 21 beige, 23.5kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TS 21 beige, 23.5kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TS 21 Beige
Pellet stove with back boiler Mytherm IOLI TS 21 red, 23.5kW
Pellet stove with back boiler Mytherm IOLI TS 21 beige, 23.5kW
Pellet stove with back boiler Mytherm IOLI TS 21 grey, 23.5kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,032.88
Pellet stove with back boiler Mytherm IOLI TS 35 grey, 38kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TS 35 grey, 38kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TS 35 Grey
Pellet stove with back boiler Mytherm IOLI TS 35 red, 38kW
Pellet stove with back boiler Mytherm IOLI TS 35 beige, 38kW
Pellet stove with back boiler Mytherm IOLI TS 35 grey, 38kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,517.05
Pellet stove with back boiler Mytherm IOLI TS 45 beige, 48.5kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TS 45 beige, 48.5kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TS 45 Beige
Pellet stove with back boiler Mytherm IOLI TS 45 grey, 48.5kW
Pellet stove with back boiler Mytherm IOLI TS 45 red, 48.5kW
Pellet stove with back boiler Mytherm IOLI TS 45 beige, 48.5kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,823.41
Pellet stove with back boiler Mytherm IOLI TSA 18 grey, with fan, 18kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TSA 18 grey, with fan, 18kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TSA 18 Grey
Pellet stove with back boiler Mytherm IOLI TSA 18 red, with fan, 18kW
Pellet stove with back boiler Mytherm IOLI TSA 18 beige, with fan, 18kW
Pellet stove with back boiler Mytherm IOLI TSA 18 grey, with fan, 18kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,136.42
Pellet stove with back boiler Mytherm IOLI TSA 21 beige, with fan, 23.5kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TSA 21 beige, with fan, 23.5kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TSA 21 Beige
Pellet stove with back boiler Mytherm IOLI TSA 21 red, with fan, 23.5kW
Pellet stove with back boiler Mytherm IOLI TSA 21 beige, with fan, 23.5kW
Pellet stove with back boiler Mytherm IOLI TSA 21 grey, with fan, 23.5kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,182.84
Pellet stove with back boiler Mytherm IOLI TSA 27 red, with fan, 29.5kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TSA 27 red, with fan, 29.5kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TSA 27 Red
Pellet stove with back boiler Mytherm IOLI TSA 27 red, with fan, 29.5kW
Pellet stove with back boiler Mytherm IOLI TSA 27 beige, with fan, 29.5kW
Pellet stove with back boiler Mytherm IOLI TSA 27 grey, with fan, 29.5kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,303.53
Pellet stove with back boiler Mytherm IOLI TSA 35 grey, with fan, 38kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TSA 35 grey, with fan, 38kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TSA 35 Grey
Pellet stove with back boiler Mytherm IOLI TSA 35 red, with fan, 38kW
Pellet stove with back boiler Mytherm IOLI TSA 35 beige, with fan, 38kW
Pellet stove with back boiler Mytherm IOLI TSA 35 grey, with fan, 38kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,656.30
Pellet stove with back boiler Mytherm IOLI TSA 45 beige, with fan, 48.5kW - Pellet Boilers Pellet stove with back boiler Mytherm IOLI TSA 45 beige, with fan, 48.5kW - Pellet Boilers
FREE DELIVERY
Brand: Mytherm Model: IOLI TSA 45 Beige
Pellet stove with back boiler Mytherm IOLI TSA 45 red, with fan, 48.5kW
Pellet stove with back boiler Mytherm IOLI TSA 45 beige, with fan, 48.5kW
Pellet stove with back boiler Mytherm IOLI TSA 45 grey, with fan, 48.5kW
 Save 20% on your fuel costs and free up your budget for extra family vacations. With this highly efficient pellet stove, you will notice the difference in just a month!   With the IOLI TS pellet stove, saving energy becomes a certainty, not a promise. Thanks to its high efficien..
£2,990.51
Pellet set BURNiT WBS AC Pellet 20 Active 30 - Pell 30, 27kW - Pellet Boilers Pellet set BURNiT WBS AC Pellet 20 Active 30 - Pell 30, 27kW - Pellet Boilers
FREE DELIVERY
Brand: BURNiT Model: 0000002652
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
£2,800.70
Pellet set BURNiT WBS AC Pellet 25 Active 40 - Pell 30, 32kW - Pellet Boilers Pellet set BURNiT WBS AC Pellet 25 Active 40 - Pell 30, 32kW - Pellet Boilers
FREE DELIVERY
Brand: BURNiT Model: 0000002653
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
£2,919.15
Pellet set BURNiT WBS AC Pellet 35 Active 50 - Pell 40, 40kW - Pellet Boilers Pellet set BURNiT WBS AC Pellet 35 Active 50 - Pell 40, 40kW - Pellet Boilers
FREE DELIVERY
Brand: BURNiT Model: 0000002654
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
£3,307.62
Pellet set BURNiT WBS AC Pellet 50 Active 70 - Pell 70, 65kW - Pellet Boilers Pellet set BURNiT WBS AC Pellet 50 Active 70 - Pell 70, 65kW - Pellet Boilers
FREE DELIVERY
Brand: BURNiT Model: 0000002655
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
£3,659.91
Pellet set BURNiT WBS AC Pellet 60 Active 90 - Pell 70, 65kW - Pellet Boilers Pellet set BURNiT WBS AC Pellet 60 Active 90 - Pell 70, 65kW - Pellet Boilers
FREE DELIVERY
Brand: BURNiT Model: 0000002656
Set of steel boiler WBS with pre-mounted pellet burner and fuel feeder. Range in nominal output from 20 to 90 kW to satisfy the heating demands of medium to large sized spaces by using the environmentally friendly fuel wood pellets. The WBS Active boiler is adapted for pellet burning, and together w..
£4,041.18
Pellet stove with back boiler Alfa Plam Commo, 22.5kW - Pellet Boilers Pellet stove with back boiler Alfa Plam Commo, 22.5kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000013681
Pellet boiler stove Alfa Plam Commo Bordeaux, 22.5kW
Pellet stove with back boiler Alfa Plam Commo Black, 22.5kW
Pellet stove with back boiler Alfa Plam Commo, 22.5kW
The pellet stove with water jacket is designed for central heating of small residence or office spaces and at the same time contributing to the more pleasant ambiance. The heart of the pellet stove is made of very thick cold-rolled metal sheet, as well as a supporting structure which ..
£2,542.67
Pellet boiler Alfa Plam Commo Compact 32, 32kW - Pellet Boilers Pellet boiler Alfa Plam Commo Compact 32, 32kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000010014
The pellet boiler is designed for central heating of small residence or office spaces. The hearth of the pellet boiler is made of very thick cold-rolled metal sheet, as well as a supporting structure which is coated with high temperature and high-quality powder -like color. The upper ..
£3,143.14
Pellet boiler Alfa Plam Commo Compact 37, 37kW - Pellet Boilers Pellet boiler Alfa Plam Commo Compact 37, 37kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000010015
The pellet boiler is designed for central heating of small residence or office spaces. The hearth of the pellet boiler is made of very thick cold-rolled metal sheet, as well as a supporting structure which is coated with high temperature and high-quality powder -like color. The upper ..
£2,988.65
Pellet boiler Alfa Plam Commo Compact, 23kW - Pellet Boilers Pellet boiler Alfa Plam Commo Compact, 23kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000010013
The pellet boiler is designed for central heating of small residence or office spaces. The hearth of the pellet boiler is made of very thick cold-rolled metal sheet, as well as a supporting structure which is coated with high temperature and high-quality powder -like color. The upper ..
£2,559.53
Pellet boiler Alfa Plam Grande 37, 37kW - Pellet Boilers Pellet boiler Alfa Plam Grande 37, 37kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000010017
The pellet boiler is designed for central heating of small residence or office spaces. The hearth of the pellet boiler is made of very thick cold-rolled metal sheet, as well as a supporting structure which is coated with high temperature and high-quality powder -like color. The upper ..
£3,226.14
Pellet boiler Alfa Plam Grande, 28kW - Pellet Boilers Pellet boiler Alfa Plam Grande, 28kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000010016
The pellet boiler is designed for central heating of small residence or office spaces. The hearth of the pellet boiler is made of very thick cold-rolled metal sheet, as well as a supporting structure which is coated with high temperature and high-quality powder -like color. The upper ..
£2,820.50
Pellet boiler Eco Spar Alba B, 18kW - Pellet Boilers Pellet boiler Eco Spar Alba B, 18kW - Pellet Boilers
FREE DELIVERY
Brand: Eco Spar Model: 0000000537
The pellet boiler is designed for central heating of residence or office spaces up to 150m². It’s designed to be suited in your basement, taking bigger care of the aestetical aspect of your living, being discreet regarding your interior decorations with its "invisible" regime of work. The hearth ..
£2,002.37
Pellet boiler Eco Spar Auriga B, 25kW - Pellet Boilers Pellet boiler Eco Spar Auriga B, 25kW - Pellet Boilers
FREE DELIVERY
Brand: Eco Spar Model: 0000000541
The pellet boiler is designed for central heating of residence or office spaces up to 180m². It’s designed to be suited in your basement, taking bigger care of the aesthetical aspect of your living, being discreet regarding your interior decorations with its "invisible" regime of work.The hearth of ..
£2,113.60
Pellet boiler stove Eco Spar Alba, 18kW - Pellet Boilers Pellet boiler stove Eco Spar Alba, 18kW - Pellet Boilers
FREE DELIVERY
Brand: Eco Spar Model: 0000000521-Ivory
It’s designed to be suited in your living room, and has a big glass window that simplifies the spreading of the warmth from the boiler and shows you the direct source of the comfort in your home - our flame.The hearth of the pellet stove is made of very thick cold-rolled metal sheet, as well as a su..
£1,941.72
Pellet boiler stove Eco Spar Auriga, 25kW - Pellet Boilers Pellet boiler stove Eco Spar Auriga, 25kW - Pellet Boilers
FREE DELIVERY
Brand: Eco Spar Model: 0000000525-Ivory
The pellet stove with water mantle is designed for central heating of residence or office spaces up to 180m². It’s designed to be suited in your living room, and has a big glass window that simplifies the spreading of the warmth from the boiler and shows you the direct source of the comfort in ..
£2,052.95
Pellet stove with back boiler Alfa Plam Commo 12, 12kW - Pellet Boilers Pellet stove with back boiler Alfa Plam Commo 12, 12kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000013685
Pellet stove with back boiler Alfa Plam Commo 12 Black, 12kW
Pellet stove with back boiler Alfa Plam Commo 12 Red, 12kW
Pellet stove with back boiler Alfa Plam Commo 12, 12kW
 pellets     radiant heating   floor heating   can be managed with an application The pellet stove with water jacket is designed for central heating of small residence or office spaces and at the same time contributing to the more pleasant ..
£2,336.48
Pellet stove with back boiler Alfa Plam Commo 15, 15kW - Pellet Boilers Pellet stove with back boiler Alfa Plam Commo 15, 15kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000013683
Pellet stove with back boiler Alfa Plam Commo 15 Bordeaux, 15kW
Pellet stove with back boiler Alfa Plam Commo 15 Black, 15kW
Pellet stove with back boiler Alfa Plam Commo 15, 15kW
The pellet stove with water jacket is designed for central heating of small residence or office spaces and at the same time contributing to the more pleasant ambiance. The heart of the pellet stove is made of very thick cold-rolled metal sheet, as well as a supporting structure which ..
£2,443.12
Pellet stove with back boiler Alfa Plam Dino 27, 27kW - Pellet Boilers Pellet stove with back boiler Alfa Plam Dino 27, 27kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000013678
Pellet stove with back boiler Alfa Plam Dino 27 Black, 27kW
Pellet stove with back boiler Alfa Plam Dino 27, 27kW
Pellet stove with back boiler Alfa Plam Dino 27 Brown, 27kW
 pellets      radiant heating   floor heating   possibility for management through applicationThe pellet stove with water jacket is designed for central heating of small residence or office spaces and at the same time contributing to the more pleasant ambiance..
£2,348.91
Pellet stove with back boiler Alfa Plam Dino, 17kW - Pellet Boilers Pellet stove with back boiler Alfa Plam Dino, 17kW - Pellet Boilers
FREE DELIVERY
Brand: Alfa-Plam Model: 0000013680
Pellet stove with back boiler Alfa Plam Dino Black, 17kW
Pellet stove with back boiler Alfa Plam Dino, 17kW
Pellet stove with back boiler Alfa Plam Dino Brown, 17kW
 pellets      radiant heating   floor heating   possibility for management through application The pellet stove with water jacket is designed for central heating of small residence or office spaces and at the same time contributing to the more pleasant am..
£2,330.79
Showing 1 to 40 of 40 (1 Pages)

PELLET BOILER

Using a pellet boiler is a highly efficient and ecological heating method, ensuring comfort, even and constant warmth throughout your home. The pellet boiler is a noiseless, absolutely safe and easy to use device. It’s an investment that pays off in a short period, usually within two or three heating seasons. The main purpose of pellet boilers is heating buildings, but they can have other uses such as supplying domestic hot water in the winter season.

Pellet boilers are made of steel or cast iron and consists of three main elements: pellet boiler with a burner, pellet supplying mechanism and a hopper for storing pellets. The equipment operates by sending pellets from the hopper to the burning chamber, the fire warms the heat carrier and gives off the warmth in the premises using heating bodies such as radiators or fan coil units.

 

Pellet Boilers

 

Main advantages of pellet boilers

  • Autonomous operation. The pellet boiler works autonomously and usually doesn’t need to be refueled every day. It’s equipped with a hopper with varying capacity (for compact pellet boilers usually 18 to 45kg and for bigger models there are hoppers with capacity of up to 500kg) and the fuel amount doesn’t need to be constantly monitored.
  • Rational and effective fuel consumption. Pellets burn by leaving a minimal amount of ash, their price is cheaper comparing to coal or wood and the burning process is highly efficient due to the high density and low moisture levels in the pellets.
  • Security and safe operation. Pellet boilers are highly automated which ensures smooth operation. The presence of independent fire prevention system, which includes control sensors, automatic fuel feed cut-off, automatic burner shut-down etc. guarantees security and safe operation.
  • Simple installation, easy to use and maintain. Usually there is no need of complicated installation designs or permits as is the case of gas based systems. Most pellet boiler models are with a built-in self-cleaning system which makes the manual part of the cleaning easy, fast and it’s not needed every day.
  • Ecological. Pellet boilers use eco-friendly fuel source- pellets don’t contain glue or other harmful substances and there are no harmful emissions when burning them. Carbon dioxide and ash content is about 10 times less compared to burning wood.
  • Programmable. The built-in control unit allows you to set up the system based on pre-selected parameters – daily and weekly timers, different power levels, turning the pellet boiler on or off, temperature control and so on.
  • WI-FI control. Some pellet boiler models are equipped with control units with built-in wi-fi modules that allow the use of an app to monitor and adjust the operation of th boiler remotely and at all times.
  • High efficiency. Special design and insulation of the pellet boiler optimizes the combustion process and helps retain the heat and maintain optimal combustion temperature. Heat losses are reduced to minimum and the produced energy is directed to heating the premises which reduces costs.

Pellet boilers are classified depending on their level of automation and they can be

  • Automatic pellet boilers. They are characterized by their non-stop operation throughout the heating season. Operation cycles are under the complete control of a CPU that takes care of fuel feeding, ignition, cleaning and ash removal. This type of equipment has high price and complicated design, it’s more expensive to install and requires very precise setting of the working parameters. The automatic pellet boiler also needs a large hopper that can supply enough fuel to keep working non-stop for long periods.
  • Semi-automatic pellet boilers. The main difference with automatic pellet boilers is the manual cleaning. It is not actually a disadvantage since cleaning is easy and takes little time (usually about ten minutes) and is needed about once per week.
  • Mechanized pellet boilers. They have compact size, simplified design and high reliability. The relatively low price makes them a very popular choice. Cleaning the heat exchanger and the ash tray is manual but the procedure is simplified, takes a small amount of time and the frequency depends of the quality of pellets used. The hopper is smaller and needs to be refueled once in several days depending on the usage intensity.

Depending on the type of burner used, pellet boilers can use

  • Torch type burner. These are the most commonly used models for heating homes. They are compact – small combustion chamber and low powered burner. They are robust, reliable and easy to use. However they are sensitive to pellet quality and are mainly used in pellet boilers with average power.
  • Burners with volumetric combustion. The pellet boilers that use this type of burner have higher efficiency and are mainly powerful and used for industrial purposes. These pellet boilers are bigger and heavier but they have low sensitivity to pellet quality.
  • Drop shaft burner. These burners are installed in smaller sized pellet boilers and stoves. They are sensitive to pellet quality, but thanks to their simple design they are highly reliable and very quiet.

According to their purpose pellet boiler are two main types

  • Central heating boilers. Used for heating and producing domestic hot water (DHW). The smallest models have around 12-15kW of power and the biggest can reach 2MW (2000kW). They are usually installed in a separate structure or room and that’s why their design is modest.
  • Boiler stoves. They are installed within the living area of the home (in a room that needs to be heated) and that’s why their design is attractive and fitting to the interior.

 

Classification according to:

 

Types and Brands of Pellet Boilers:

Bulgarian Pellet Boilers Balkan Energy

Bulgarian pellet boilers with a modern design and intelligent control, manufactured according to all European operating standards. With power outputs from 20 to 35 kW and high efficiency, they provide the desired warmth and comfort without straining your monthly budget. Thanks to the Wi-Fi module, the boilers can be operated remotely and adjusted by our staff. The Balkan Energy pellet boilers with a water jacket are equipped with a water pump and expansion tank.

Macedonian Pellet Boilers EcoSpar

EcoSpar pellet boilers are extremely compact, allowing them to be installed on isolated balconies and terraces, as long as they are protected from freezing. Pellet boilers up to 25 kW have a built-in pump, expansion tank, and hopper. An advantage of these pellet boilers is the solid cast iron combustion chamber, capable of lasting for many years without replacement.

Pellet Boilers Alfa Plam

The Italian Alfa Plam pellet boilers can heat spaces up to 200 m² with very low fuel consumption. They are equipped with a circulation pump, expansion tank, and safety valves, which significantly reduce the investment in heating if you need to purchase these parts separately.

Also, check out our offers for flue pipes for pellet boilers.

 

Balkan Energy Aurora B   Eco Spar Aurora B   Alfa Plam Commo Compact

 

 

Frequently Asked Questions about Pellet Boilers

 

  1. How is a pellet boiler maintained?
    Regular cleaning and system checks are important for maintaining boiler efficiency.
  2. How often should I fill the pellet hopper?
    The frequency of filling depends on the size of the hopper and the intensity of the boiler's use.
  3. Can I install a pellet boiler myself?
    The installation of a pellet boiler should be carried out by a qualified specialist.
  4. What is the efficiency of pellet boilers?
    The efficiency of pellet boilers can reach 90% or more.
  5. What pellets are best for my boiler?
    High-quality wood pellets with low moisture and ash content are the best choice.
  6. What are the chimney requirements for a pellet boiler?
    The chimney must be of suitable size and comply with all regulatory requirements.
  7. How long does a load of pellets last?
    The operating time depends on the hopper capacity and the boiler settings.
  8. What should I do if the boiler stops working?
    Check for pellets and the condition of the combustion chamber. If needed, contact a service center.
  9. How noisy is the pellet boiler?
    Modern pellet boilers are designed to operate quietly.