Menu
Your Cart

Turbulator set for wood stove furnace Sunsystem Burnit NWB MAX 20

Turbulator set for wood stove furnace Sunsystem Burnit NWB MAX 20 | Combustion Chamber for Boilers | Boiler Parts |
Turbulator set for wood stove furnace Sunsystem Burnit NWB MAX 20 | Combustion Chamber for Boilers | Boiler Parts |
Turbulator set for wood stove furnace Sunsystem Burnit NWB MAX 20 | Combustion Chamber for Boilers | Boiler Parts |
Turbulator set for wood stove furnace Sunsystem Burnit NWB MAX 20 | Combustion Chamber for Boilers | Boiler Parts |
Turbulator set for wood stove furnace Sunsystem Burnit NWB MAX 20

Turbulator set suitable for Sunsystem Burnit NWB MAX and NWB PRIME boiler.

  • Stock: In Stock
  • SKU: 14.453.012
£68.63
Excl. VAT

*Products are shipped from Europe. The customer must pay any applicable VAT and customs duties.

Estimated delivery
07.Dec.2026
DHL Schenker Dachser
See Shipping Policy

365 DAY RETURN
​365 daysSee details

SECURE PAYMENTS
    See details

A turbulator is a device that turns a laminar flow into a turbulent flow.

The heat transfer coefficient for liquids and gases flowing through pipes in heat exchangers tends to be limited due to a fluid boundary layer close to the pipe wall that is stagnant or moves at slow speed, thus acting as an insulating layer. Such heat exchangers are, for example, in domestic central heating systems. This boundary layer can be broken or reduced in thickness if turbulators are placed in the pipe, which create a turbulent flow that reduces the boundary-layer thickness and thereby increase the heat-transfer coefficient.

Characteristics
Weight (kg) 25.0000
Country of Manufacture Bulgaria
Warranty 6 months
Model NWB MAX 20
Compatibility BURNiT